As for construction
timing, well, it depends. Are we going to base this on how the T
does things currently or "best case scenario"? Right now
the T is looking at opening the Green Line to Medford in 2014. The
way the T runs things I'd say its a better bet for sometime between
2015-2017. It's a shame really when you think about how fast they
can build these things in Europe or China.
The idea behind
my map was that this was something that could be finished and opened
by 2050 if all parties decided that this was the plan and put their
full support behind it. If you think about when the original subway
was planned and opened you get a similar time
frame, planned in 1894, first opened in 1897, last major addition
to the original system was in the 1920s.
But for a simple answer, all lines through Somerville (Green Line
to W. Medford, Urban Ring) could be opened by 2020-2025. But that
is "best case scenario."